360 mw dual fuel gas hsd combined cycle power plant project
1-20 ton gas/oil fired boiler
Capacity: 1-20 ton/h
Pressure: 0.7-2 Mpa
Fuel: Nature gas, coke oven gas, biogas, methanol, liquid propane gas, diesel, heavy oil, light oil, crude oil, etc.
Industries: Heat supplying, chemical, food, textile, printing and dyeing, cigarettes and tobacco, fodder, pharmacy, building materials, brewery, rubber, hospital etc.
7-70 MW gas/oil fired hot water boiler
Capacity: 7-70 MW
Pressure: 1.0-1.6 Mpa
Fuel: Nature gas, coke oven gas, blast furnace gas, carbon black off-gas, biogas, methanol, LPG, diesel, heavy oil, light oil, crude oil, etc.
Industries: Heat supplying, hospital, colleges and universities.
2.8-29mw coal fired boiler
Capacity: 2.8-29mw
Pressure: 1.0-1.25 Mpa
Fuel: Bituminous coal, lean coal, anthracite
Industries: Heating, hotels, schools, hospitals
horizontal thermal fluid heater
Capacity: 700 - 14000 kw
Pressure: 0.8 - 1.0 Mpa
Fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil
Industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries
1-20 ton biomass fired boiler
Capacity: 1-20 ton/h
Pressure: 0.7-2.5 Mpa
Fuel: Biomass particles
Industries: Heating, chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital

360 MW Dual Fuel (Gas/HSD) Combined Cycle Power …
The most common type of combined cycle power plant utilizes gas turbines and is … based on Wärtsilä gas or dual-fuel …Environmental Impact Assessment for the …1410 MW Dual Fuel Fired Combined Cycle Power Project at … similar technology of 360 MW each in existing plant … nearby py-01 offshore gas …

360 MW Dual Fuel (Gas/HSD) Combined Cycle Power …
Henan Sitong Boiler Co., Ltd. Meet the professional industrial boiler manufacturer. Sitong Boiler is the professor of industrial boiler manufacturer, with the certificates of ISO 9001, CE, SGS, BV, etc.

Economic Impact of Dual Fuel for Gas Turbines …
An analysis of dual fuel capability highlights the economic advantage of providing combined-cycle power plants with the ability to operate on both natural gas and liquid fuel.

Combined-Cycle Power Plant – How it Works | GE …
2019-5-23 · How a Combined-Cycle Power Plant Produces Electricity . This is how a combined-cycle plant works to produce electricity and captures waste heat from the gas turbine to increase efficiency and electrical output. Gas turbine burns fuel. The gas turbine compresses air and mixes it with fuel that is heated to a very high temperature.

Power - Infrastructure Development Company Limited …
450 MW Gas Fired Power Plant : 34.5 MW Natural Gas based Captive Power Plant : 51 MW Gas Fired Rental Power Plant : 34.5 MW Gas based Rental Power Plant : Four Gas based Small Power Plants with a combined capacity of 110 MW : 11.60 MW captive power plant : 33.75 MW Summit Power Limited Expansion Project : Approved : 52.2 MW Dual Fuel Power

Sembcorp signs PPA for Sirajganj 4 power plant | …
The Government of Bangladesh has signed two deals concerning the 414 MW dual-fuel (gas and high speed diesel, HSD) combined cycle power plant in Sirajganj. Close. Benefits of subscribing Sembcorp signs PPA for Sirajganj 4 power plant. HSD) combined cycle power plant in Sirajganj.

Sirajganj 225 MW Combined Cycle Power Plant (2nd …
NWPGCL currently has two operating power stations – Sirajganj 1 (225 MW dual fuel Combined Cycle Power Plant (CCPP)) and Khulna (150 MW Peaking Power Plant) – and one station under construction, Bheramara (360 MW CCPP). The Project involves the construction, installation and operation of a 225 MW dual fuel CCPP (similar to Sirajganj 1

Sirajganj 220MW Combined Cycle Power Plant 3rd …
Environmental Impact Assessment (EIA) of the proposed Sirajganj 225 MW Combined Cycle Power Plant Project (Dual Fuel-3rd Unit) prepared by the Center for Environmental and Geographic Information Services (CEGIS), dated November 2015. o Volume I: Main Report, o Volume II: Occupational health, Safety and Environment Plan.

LPG Burning Gas Turbine for Power Generation - LPG Apps
2018-8-21 · LPG Burning Gas Turbine for Power Generation Jan. 2014 Hitachi Proprietary Off Gas / Natural Gas 2006 11 O-Plant Korea 31.38 MW H-25 (32C) 1 Water Injection Off Gas (C1/C3 Gas) 2008 Dual fuel burning system with back up fuel is available. Availability

Committed Projects | Summit Power International
Work in Progress. Our project which is currently under construction in Bangladesh is the Meghnaghat II, a dual-fuel CCGT GE H Class plant with gross capacity of 590 MW.The expected cost of the project is estimated at USD 501 million and anticipated commencement of production in early 2022.